视频:在中国的COMAC C919机上是什么感觉

视频:在中国的COMAC C919机上是什么感觉

BY JETSTREAM MAGAZINE Published 4 hours ago 0 COMMENTS

Originally published in Jetstream Magazine by Daniel Mena.

 

那是香港国际机场一个阴沉的九月清晨。

 

台风塔帕让我在澳门滞留了三天,但与朋友相处一段时间后,我很高兴又能重返天空。对于大多数在17号登机口的旅客来说,这只是一次普通的飞往上海的短途航班——例行且容易被忘记。但对我而言,这次飞行意义非凡。

 

我即将登上中国的COMAC C919,这是一款国产新干线客机,距投入运营仅两年时间,承载的雄心远不止于跑道之上。

 

 

COMAC C919是中国本土生产的短程客机,旨在与Boeing和Airbus在日益竞争的市场中竞争。尽管该机型尚在寻求中国以外的认证,但目前正在被Air China、China Eastern和China Southern等航空公司越来越多地用于中国境内的区域航线。

 

{{REC}}

AirlineDepartureArrival
China Eastern上海 (SHA)成都 (TFU)
China Eastern上海 (SHA)广州 (CAN)
China Eastern上海 (SHA)太原 (TYN)
China Eastern上海 (SHA)重庆 (CKG)
China Eastern上海 (SHA)西安 (XIY)
China Eastern上海 (SHA)北京 (PEK)
China Eastern上海 (SHA)北京 (PKX)
China Eastern上海 (SHA)沈阳 (SHE)
China Eastern上海 (SHA)武汉 (WUH)
China Eastern上海 (SHA)厦门 (XMN)
China Eastern上海 (SHA)深圳 (SZX)
China Eastern上海 (SHA)香港 (HKG)
China Southern广州 (CAN)太原 (TYN)
China Southern广州 (CAN)长沙 (CSX)
China Southern广州 (CAN)上海 (SHA)
China Southern广州 (CAN)郑州 (CGO)
China Southern广州 (CAN)西安 (XIY)
China Southern广州 (CAN)武汉 (WUH)
China Southern长沙 (CSX)北京 (PKX)
Air China北京 (PEK)重庆 (CKG)
Air China北京 (PEK)杭州 (HGH)
Air China北京 (PEK)成都 (CTU)
Air China北京 (PEK)武汉 (WUH)
Air China北京 (PEK)上海 (SHA)

 

今天,我有幸乘坐B-919A——首架投入商业运营的C919。过去四年我几乎每周都乘坐Airbus A320和Boeing 737,所以我很期待看看C919与它们相比如何。中国真的能制造出一款世界级的客机吗?

 

{{AD}}

The History of COMAC's C919

 

2008

  • 28 October - COMAC launches the C919 program, targeting a maiden flight in 2014.

 

2010–2015

  • Chinese cyber group “Turbine Panda” allegedly infiltrates multiple Western aerospace suppliers to steal intellectual property related to C919 components.

 

2011

  • June - COMAC signs a cooperation agreement with Ryanair for C919 development.
  • 24 November - COMAC completes the joint definition phase, ending preliminary design; detailed design scheduled for 2012.
  • 9 December - Production begins on the first C919 prototype.

 

2012

  • Composite wing development is completed (but later abandoned)—results not made public until 2018.

 

2013–2014

  • Prototype final assembly expected in 2014, but significant delays occur. Zhuhai Airshow announcement confirms first flight delayed to 2017.

 

2015

  • COMAC rolls out the first C919 aircraft.

 

{{REC}}

 

2017

  • May - High-speed taxi testing is completed.
  • 28 July - The C919 performs its maiden flight from Shanghai Pudong. COMAC announces a 4,200-hour test program aiming for service entry in 2020.
  • 28 September - First prototype’s second flight lasts 2 hours and 46 minutes.
  • 3 November - First prototype completes its third flight, reaching 3,000 m in altitude.
  • 10 November - Prototype is transferred from Shanghai to Xi’an for further testing.
  • 17 December - Second prototype completes its maiden flight.

 

2018

  • 12 July - Static load testing simulates a 2.5g maneuver, bending wings nearly 3 meters during testing.
  • Mid-year - Reports surface of flight-test grounding for modifications, though COMAC denies grounding and calls the work routine.
  • 28 December - Third prototype performs its first flight.

 

2019

  • January-August - COMAC continues to expand its fleet of test aircraft. International espionage investigations result in arrests of four individuals in the U.S. connected to theft of aerospace trade secrets.
  • 1 August - Fourth prototype completes its maiden flight.
  • 24 October - Fifth prototype completes its maiden flight to support extreme weather and environmental system tests.
  • 27 December - Sixth and final flight-test prototype completes its maiden flight.

 

2020

  • 27 November - C919 receives CAAC type inspection authorization, confirming the aircraft’s structural design is finalized.

 

{{AD}}

 

2022

  • 14 May - First pre-delivery flight test of aircraft B-001J (MSN107) is completed at Shanghai Pudong.
  • May - COMAC lists the C919 at 653 million yuan (~US$101M), near the price of A320neo/737 MAX.
  • 29 September - C919 receives CAAC airworthiness certification.
  • 9 December - First operational C919 is delivered to China Eastern Airlines.

 

2023

  • January-April - China Eastern conducts numerous route-proving flights; thrust reverser issues delay verification.
  • 7 May - Test flights resume after a three-month grounding.
  • 28 May - First commercial passenger service: Flight MU9191 departs Shanghai Hongqiao (SHA) and lands in Beijing Capital (PEK).
  • 29 May - Regular daily service begins between Shanghai Hongqiao (SHA) and Chengdu Tianfu (TFU).
  • 14 July - China Eastern receives its second C919 (B-919C).
  • September - Suparna Airlines signs an agreement to lease 30 C919 aircraft (US$3.6B framework).
  • 20 September - Brunei’s GallopAir begins certification processes to operate the C919; deliveries targeted for Q3 2024.
  • 12-17 December - The C919 appears at Hong Kong International Airport; on 16 December it performs a demonstration flight over Victoria Harbour.
  • 17 December - COMAC and Tibet Airlines sign a deal to jointly develop a high-altitude version of the C919.

 

2024

  • February - C919 performs an international flying display at the Singapore Airshow—its debut outside China; Tibet Airlines orders 40 C919s, including high-altitude variants.
  • May 2024 - The first delivered C919 (B-919A) passes its first “A-inspection” after a year of operation.
  • 1 June - First commercial flight outside mainland China takes place, flying students from Hong Kong to Shanghai.
  • 29 August - Air China takes delivery of its first C919.

 

{{AD}}

 

2025

  • August - Outer wingbox of the first C919-600 (shortened variant) receives CAAC structural approval—the first certified component of the shrunken model.

 

Onboard the C919

 

机舱内部,C919看起来与竞争对手差别不大:商务舱为2-2布局,经济舱为26排3-3布局。行李舱明显偏小,但仍可用。我记得在737上,头顶行李舱能轻松放下我的随身行李并留有富余空间。今天,我的包几乎刚好塞进去。

 

C919的商务舱为2-2布局,经济舱为3-3布局。

 

China Eastern的C919经济舱座距为30英寸,座宽为18英寸。座椅较薄,这是航空公司为了提高载客密度越来越常见的做法。作为参考,Boeing 737在美国的平均腿部空间为30到32英寸,平均座宽约17英寸。COMAC的设计并不偏离这一标准。

 

{{AD}}

我的腿部空间不错,尽管这是由航空公司决定的,而非制造商。

 

在安全演示时,乘务员提到了飞机,并说明我们“乘坐的是COMAC C919,中国国产的商用飞机”。航空公司对该机型的自豪甚至延伸到了座椅头枕套,上面写着“The World's First C919”。

 

不确定这是否只有B-919A才有,但无论如何这是个很酷的细节。

 

纪念首架投入客运的C919——B-919A的头枕套。

 

我在C919上注意到的主要不同点是噪音。起飞前不久,一位乘务员要求我摘下耳机(可能是出于安全考虑?),即便是没有戴耳塞,我也几乎听不到发动机的轰鸣。飞机安静得令人惊讶。

 

{{JETSTREAM edition="winter2526" article="W12"}}COMAC_C919_Hong_Kong-Shanghai_Video_Recap{{/JETSTREAM}}

 

除了噪音以外,这次飞行感觉和其他航班无异:有完整的餐食服务,每隔几排上方设有机上娱乐系统,还有饮品服务,乘务员用标有"The World's First C919"字样的杯子提供饮料。

 

{{REC}}

 

当地时间下午2:34,大约起飞后2小时4分钟,我们抵达上海虹桥。总体而言,我很享受这次飞行,我认为从乘客体验的角度看,C919在短中程市场中是一个非常有竞争力的选手。

 

The Future of the C919

 

尽管C919目前尚未在全球范围内与Airbus或Boeing匹敌,但它代表着更宏大的意义:多极化航空世界的黎明。随着小型制造商争取市场份额,主要参与者被迫在战略上进行创新。

 

B-919A停在香港,就在载我飞往上海之前。

 

尽管最初目标是2025年交付75架,COMAC因运营挑战被迫将目标下调到25架。此外,C919对西方部件的依赖,例如其发动机CFM LEAP-1C,为其供应链带来额外的物流挑战。然而,中国正努力研发自主发动机ACAE CJ-1000A,COMAC计划在未来的C919上采用该发动机。

 

随着订单增长,COMAC正计划建设第二座C919生产工厂,以满足当前和预期订单的需求。根据媒体Science and Technology Innovation Board Daily的报道,第二工厂选址已确定在上海浦东的“临港新片区”,总建筑面积为300,000平方米。这约为3.2百万平方英尺,约为Boeing位于华盛顿州Everett工厂的三分之二到三分之二多出的规模。

 

{{AD}}

 

该媒体还报道,“项目建成后,可满足C919未来的大规模生产需求。”该工厂计划于2027年投产。

 

 

目前,C919仅限在中国境内飞行。不过,根据South China Morning Post的报道,中国民用航空局(CAAC)已与European Union Aviation Safety Agency(EASA)就在欧盟取得认证进行接触。EASA的成员甚至在7月对上海机场的C919进行了现场检查。这些进展对该机型的未来具有积极意义。

 

 AeroXplorer is on Telegram! Subscribe to the AeroXplorer Telegram Channel to receive aviation news updates as soon as they are released. View Channel 

Comments (0)

Add Your Comment

SHARE

TAGS

旅行报告 Jetstream Magazine COMAC C919 旅行 China

RECENTLY PUBLISHED

KAL858: 震惊世界的朝鲜炸弹袭击 1987年11月29日登上Korean Air Flight 858的99名乘客中,很少有人能想到他们的旅程会以成为航空史上最黑暗的谜团之一而告终。 故事 READ MORE »
幽灵网络: 第五航权航班的兴起、衰落与复苏 第五航权航班 — 指航空公司在其母国以外两个国家之间飞行的航线 — 一直处于航空界的暮光地带。我们记录了这些航线的兴起、它们几近消失的过程,以及至今仍然蓬勃发展的那些令人惊讶的市场。随后我们将带你登上一趟特殊的 Seoul-Tokyo 第五航权航班,展示这种体验与典型区域航空公司的航班相比如何。 旅行报告 READ MORE »
美国空军将成立新的实验性"一次性攻击"无人机部队 此举标志着美国空中力量的重大转变,美国空军正准备成立其首个专门用于"一次性攻击" (OWA) 无人机的实验性单位。 信息类 READ MORE »


SHOP

$2999
NEW!AeroXplorer Aviation Sweater Use code AVGEEK for 10% off! BUY NOW