Exclusive: Reagan National Eyes Replacement of Historic Terminal 1

Exclusive: Reagan National Eyes Replacement of Historic Terminal 1

BY WINSTON SHEK Published on September 26, 2022 1 COMMENTS

According to a document viewed by AeroXplorer, Washington D.C.'s Reagan National Airport (DCA) is set to redevelop its historic Terminal 1, formerly known as Terminal A. This proposed move comes after the airport completed construction on the $1-billion Project Journey, including replacing a set of bus gates known as 35X with a 14-gate commuter concourse.

 

The document adds that the group that operates the airport, the Metropolitan Washington Airports Authority (MWAA), plans to pursue a Department of Transportation (DOT) grant worth $637.5 million in 2023. Unfortunately, no further details are given on a timeline, or the scope and plan for the project, though the MWAA seeks money for Terminal 1 utility relocation in 2024.

 

In a statement to AeroXplorer, MWAA spokesperson Robert Yingling noted that "a future Terminal 1 redevelopment project for Reagan National is in the early stages of concept development, but no project details are available at this time." However, a statement on the pursuit of a DOT grant for the redevelopment of Terminal 1 is still quite indicative of future proceedings. Any movement on seeking environmental approval for the project would be another lead indicator.

 

The facade of the original terminal building was renovated in 2008. Photo: MWAA

 

The 9-gate banjo concourse dates back to 1970, as a commuter concourse for Northwest and TWA, per Edward Russell. In 2014, the MWAA completed a renovation of Terminal 1 and the concourse, including the historic lobby by expanding the security area, while modernizing the concourse and check-in areas.

 

Within the past year, the MWAA completed Project Journey, which erected a new 14-gate regional concourse to replace an array of dreaded bus gates known as Gate 35X. In addition, a centralized security screening area was constructed, optimizing connections between concourses for American Airlines.  

 

Previously, to replace Gate 35X, multiple proposals were explored, including a lower-cost pier on the south end adjacent to the 9-gate banjo. This highlights the amount of available space for the new terminal.
 

The National Hall is pictured above, uniting Terminal 2 with a line of shops and restaurant options. Most notably, before the area became pre-security, it was known for its glorious views of the ramp and apron for spotters. Photo: Brandon Sultan

 

The proposed new terminal is probably linked with the completion of Project Journey via a fully secure "National Hall, " a former pre-security area home to the majority of the shops and dining at Reagan National. A new terminal could lead to all terminals being linked post-security, rather than requiring passengers to exit and re-screen.

 

Currently, Terminal 1 is operated by three main carriers: Air Canada, Frontier, and Southwest. Southwest Airlines is the primary user of Terminal 1 with a vast array of destinations, while Frontier Airlines only operates services to Denver. Air Canada offers services to Montreal, Ottawa, and Toronto.

 

In a July board meeting, MWAA Chairperson William Sudow noted that these grant proposals will be part of a multi-billion dollar capital program starting in 2023 with partner American Airlines.

 

Proposals for Dulles

 

In addition, a separate document details more DOT grant proposals for the region's primary international airport: Washington Dulles International Airport. Specifically, the document reveals a project expanding the airport's Z-Gates by 3 gates, developing the "South Cargo area," and electrifying the airport's historic Mobile Lounges.

 

Overall, these projects will be in conjunction with a grant proposal earlier this year: a 14-gate concourse replacing a smaller regional concourse for United Airlines. The airport was awarded nearly $50 million for the project from the DOT, slated for completion in 2026. Similarly, Chairperson Sudow commented that this is the first phase of a multi-billion dollar terminal redevelopment program spanning 15 years with United Airlines.

 

Overall, the MWAA will oversee two critical capital infrastructure programs, as the authority looks to develop its airports for the future.

 AeroXplorer is on Telegram! Subscribe to the AeroXplorer Telegram Channel to receive aviation news updates as soon as they are released. View Channel 
Winston Shek
Winston is an avid aviation photographer who currently resides in the DMV. He is currently a student at the University of Virginia. In his free time, he likes to play chess or practice his photography.

Comments (1)

Sam Bharr Nicely written, Winston. I hope you keep your eye on this. I think it would be a shame to lose this ornate and historical structure. I hope they preserve lots of it. I'd love to see a diagram and photos of what parts might be razed and others which might be saved--when more details become available. Imagine if we started demolishing some of the world's historical train terminuses in old city centers.. There would be an uproar!
1320d ago • Reply

Add Your Comment

TIPLogin or sign up to personalize your AeroXplorer experience.

TAGS

NEWS MWAA Reagan National DCA Washington National New Terminal Renovation

RECENTLY PUBLISHED

Emirates Has Painted the UAE Flag Across an Entire A380 and It Has Already Flown to New York and Brisbane Emirates has unveiled one of the most visually striking special liveries in its 41-year history, a bold, full-fuselage rendering of the UAE national flag across one of its iconic Airbus A380 superjumbos. NEWS READ MORE »
Saudi Arabia's New Airline Just Applied to Fly to America Riyadh Air, Saudi Arabia's second flag carrier and one of the most closely watched aviation startups in recent memory, filed a formal application with the United States Department of Transportation on May 5, 2026, seeking a foreign air carrier permit and exemption authority to operate scheduled and charter services between the Kingdom and the United States. NEWS READ MORE »
Two Southwest Jets Clipped Each Other at the Gate in Baltimore Where ATC Has No Eyes Two Southwest Airlines Boeing 737 aircraft collided during pushback at Baltimore/Washington International Thurgood Marshall Airport. NEWS READ MORE »


×
AeroXplorer+

More than just headlines.

Get unlimited ad-free access to in-depth aviation news, premium stories, and exclusive insights other sites don't cover.

  • Ad-free browsing on AeroXplorer
  • Unlimited access to premium and exclusive articles
  • Higher photo upload limits & commissions on sales
  • Free access to Jetstream Magazine on higher tiers
Join over 3,000 aviation enthusiasts. Cancel anytime.
Basic+ $2.99/mo
  • Ad-free browsing
  • Sell aviation photos with 60% commission



What is your estimated annual budget for aviation-related purchases?

We're building something new for our community.